ALF2 Construction Update – May 28, 2010 – shelving installation-1

The construction crew has been hard at work installing the framework for the shelving for ALF2.  It is pretty amazing the speed with which they are getting the framing up and how much as been accomplished in a relatively short period of time.  Two semi-trucks loaded with shelving, or parts of shelving, arrive daily and the crew works until that day’s shipment is installed.  This batch of photos was taken about ten days into the process.